Services04Real-time drilling optimisation

Engineers on the data, while the well is drilled.

Most hard wells are planned with great care. The plan is then only as good as the decisions made at the rig. We set up a real-time drilling centre round your well, with engineers who read the data as it arrives and tell you early.

Who it is for
Operators with a well drilling now, or soon
Where we join
One well, one hard section, or a whole campaign
What you hold after
Daily analysis, early warnings and an impartial record of the well
The drill string at the bottom of the well, turning, with its measurement tool above the bit

01At the bit

Catch it while it is still one bad hour.

A real-time centre is a technical magnifying glass on the well. Problems are small when they start. If someone is reading the data with the plan open beside it, they are caught and corrected in time, and the decision is based on engineering, not on habit.

  • Issues caught and corrected in time
  • Informed decisions, from solid engineering analysis
  • Cost-effective wells, through active collaboration with your team
Solid bands of data rising up the drill string and along a flowline to a screen at surface

02Up the string

Everything the rig measures, read by an engineer.

The data climbs from the bit to surface, and we meet it there. Field and town experience come together on one screen, with calibrated models predicting what should happen next. Every vendor’s performance is visible, and the reporting is impartial and open.

  • Field and town drilling experience, joined up
  • Solid engineering with modern data analysis
  • Critical vendor performance, made visible
  • Calibrated predictive models, to optimise execution
  • Impartial, transparent reporting
A screen slab at surface showing the RT-DOX Dynamic Performance Gap capture

03The screen

The plan and the well, side by side.

This is the picture the engineers work from: RT-DOX, our own software, showing the well as drilled against the plan. It is a result screen from an example well, not a client’s.

  • Your real-time data, used to its full value
  • A customised centre, working only for you
Two rails above the screen drawn apart: the plan, and the actual, with the gap between them marked

04The measure

One number for how the section is going.

The Dynamic Performance Gap is our real-time moving-average performance measure. The rail the plan sets and the rail the well draws start together. The distance that opens between them is what the engineers watch, and what they bring to your morning call.

  • Real-time, moving-average performance measure
  • Shown in RT-DOX, next to the plan

Ways to run it

Five ways to use a real-time centre.

From one daily review to full cover with hand-over. And five reasons clients pick ours.

Operating models

  1. 01
    Daily analysisEach morning, a read of the previous 24 hours of drilling: what was slow, what was fast, and why.
  2. 02
    Offset data analysisPast wells recreated from their data, so the next design starts from what really happened.
  3. 03
    24/7 trend watchingRound-the-clock analysis of the real-time trends, which can reduce the mud-logging crew.
  4. 04
    Full-scale 24/7 optimisationReal-time data analysis and drilling optimisation with full coverage of the well.
  5. 05
    Full coverage, then hand-overAs above, with training so your own team takes the real-time operation over.

Why ours

  1. 01
    Unbiased and vendor-neutralAnalysis that answers to the well, not to a contractor, and is customised to your wells.
  2. 02
    What the major operators haveThe result of an in-house real-time centre, without building one.
  3. 03
    UK-based expertsDrilling optimisation specialists, working from the UK.
  4. 04
    Real-time data used fullyModern data technology puts the rig’s data to its greatest use.
  5. 05
    FlexibleCustomised as you need it, for one well or only for the challenging sections.

What it is worth

Value, in the company’s own estimates.

These are the company’s published figures and claims, not a promise for a particular well. A pilot on one well is available, at a discount, to show the idea working.

5% to 8%expected fall in drilling cost from a well-tuned real-time centre

< 0.5%of the cost of most offshore wells, what the service costs

  1. 01
    Drilling costFor a well-tuned real-time centre, the company expects drilling costs to fall by 5% to 8%.
  2. 02
    What it costsFor most offshore wells, less than 0.5% of the well cost, so one timely intervention can pay for the service on the whole well.
  3. 03
    Full-circle coverA real-time centre is how the whole well-cost optimisation loop is closed: design, plan and delivery.
  4. 04
    One well or one sectionYou can engage the service for a single well, or for the challenging sections only.
  5. 05
    Safety and integrityBetter well safety and integrity, which can bring well insurance costs down.
  6. 06
    Mud loggingMud-logging crews can be replaced or reduced for the non-critical top sections.

Start

Put an engineer on the next well, even if only for one section.

Tell us the well, the rig and the section that worries you. We will say how we would cover it. A one-well pilot is on offer.