Services01Well engineering and drilling design

Every string and every load, settled before the rig arrives.

We design wells, and we take apart designs that already exist. Casing, loads, drillability, cement, time and cost are worked through as one piece of engineering, so the well that reaches the rig is simpler, safer to drill and cheaper to deliver.

Who it is for
Operators’ drilling and wells teams, for one well or a campaign
Where we join
At any gate: Assess, Select, Define or Execute
What you hold after
A basis of design, a drilling programme and an AFE

01Basis of design

Start from the pressures, not from the pipe.

A well design is an answer to the ground. Pore pressure and fracture gradient leave a window that the mud weight has to stay inside, and wherever that window closes, a casing string has to be set. We build the window from your offset data first. Everything else follows from it.

  • Basis for well design, with each choice traced to its reason
  • Risk analysis, for the well and for each hole section
  • What-if modelling, to test the design against the cases that would break it

02Casing and tubulars

Each string is checked against the worst day it will ever have.

Burst, collapse, tension and the combined load, while drilling, while producing and for the years after. Casing and tubing are designed in StressCheck and WellCAT. What comes out is the right string for this well, not the one that was run last time.

  • Detailed casing and tubular design
  • Casing wear prediction, with a plan to limit it
  • Review of an existing design: what can be simpler, and what it saves

03Torque, drag and hydraulics

A design only counts if the string gets to bottom.

We model torque, drag and hydraulics for every section, then calibrate the model against wells you have already drilled. A calibrated model is what lets the rig decide quickly whether what it sees is normal. On a long-reach well it also says how far you can safely step out.

  • Specialist modelling for complex wells and difficult sections
  • Extended reach designs, checked against your technical limits
  • Section guidelines: limits, lessons learned and the practices to keep

04Cement and zonal isolation

Cement has to go all the way round.

Isolation fails where the pipe lies against the wall and mud is left behind it. We model standoff, put centralisers where they do the work, and design the slurry and the pumping schedule for the hole you actually have.

  • Centraliser number and placement, from a standoff model
  • Fit-for-purpose slurries and pumping schedules

05Programme, time and cost

Then the whole well, as one document.

The design becomes a drilling programme, a time and cost estimate and an AFE. We also help choose what goes on the rig: managed pressure drilling, casing while drilling, rotary steerables, underreamers. And we rank the tenders that come back on technical merit.

  • Drilling programme, time and cost (AFE), for each gate
  • Technology analysis and selection
  • Technical evaluation and ranking of service tenders

Deliverables

What you can ask us for.

Grouped the way a well is engineered. Take one piece of work, or the whole design.

Design and basis

  • Drilling engineering for every gateAssess, Select, Define and Execute, with what each gate asks for: time and cost (AFE), basis for well design, risk analysis and the drilling programme.
  • Risk-based modellingWhat-if cases run through the engineering models, to prove the final design before it is approved.
  • Design review and optimisationAn existing design or procedure taken apart to find what can be simpler, and what that saves.
  • Extended reach designsDetailed ERD well engineering for wells that push the step-out.

Tubulars and loads

  • Casing and tubing designDetailed tubular and casing designs in StressCheck and WellCAT.
  • Casing wearPrediction for drilling and workover operations, and a plan to limit it: stand-off devices, drilling parameters or a change of trajectory.

Drillability and limits

  • Specialist modellingFor complex wells and for the sections that are hard to drill.
  • Calibrated modelsEngineering models tuned to your own wells, so the rig can make a sound decision quickly.
  • Section guidelinesFor difficult sections: the technical limits, the lessons already learned and the practices that keep the section on course.
  • NPT reviewNon-productive time events read through the engineering, so they are not repeated.

Cement and isolation

  • Zonal isolationString centralisation, fit-for-purpose cement slurries and pumping schedules.

Decisions, tools and people

  • Technology selectionAnalysis and selection of managed pressure drilling, casing while drilling, rotary steerable systems and underreamers.
  • Tender evaluationDrilling and wells service tenders evaluated and ranked on technical merit.
  • Software testing and validationWell engineering software calibrated with actual data and compared in detail against the established packages, to show where it can improve.
  • Hands-on trainingFor your drilling and wells team, on the EDM applications: StressCheck, COMPASS and WellPlan.

StressCheck, WellCAT, COMPASS, WellPlan and EDM are trade marks of Halliburton.

Proof

Three times the engineering changed the well.

From the company’s published results. Every engagement is confidential, so no operator or field is named.

  1. $4.5Msaved in well costs

    Managed pressure drilling, shown to be unnecessary

    A global operator’s design carried managed pressure drilling. We recalibrated the drilling window from downhole pressure data and found a narrow but workable window without it. An independent wellbore stability study later agreed.

  2. 70%of the planned centralisers

    An over-design, proved on the cement log

    Our standoff model showed that 70% of the planned centralisers were enough. A shipment problem left the rig with 65%, placed to our revised model. The cement evaluation log matched the prediction.

  3. Root causefound in the trajectory

    Casing wear nobody was looking for

    Shallow horizontal wells were being delivered without trouble. Our review found serious casing wear, caused by the shape of the trajectory, on light production casing. The next wells got new trajectories and heavier casing.

All results

Start

Send us the well. We will tell you what we would change.

A design, a programme, or only the problem. We read it and come back with where we would look first. Every engagement is strictly confidential.